Project context
An established utility-scale PV asset was being developed into a hybrid platform through multi-phase battery storage integration. The assignment required a structured technical due diligence review that connected configuration, delivery evidence and operating data without losing sight of whole-system behaviour.
Technical contribution
- Structured technical due diligence across system configuration, design and delivery documentation, operational evidence and project interfaces
- Reviewed PV and BESS data, performance indicators and operating constraints to test whether the available evidence supported the technical narrative
- Assessed multi-phase storage integration, controls interfaces and key technical risks affecting hybrid operation
- Prepared clear technical findings and supporting material for independent review and stakeholder decision-making
Why it matters
Technical due diligence on hybrid assets must connect documents with evidence of how the plant is configured, commissioned and operated. A concise, technically grounded review helps stakeholders distinguish material integration risks from manageable open items and supports decisions without disclosing sensitive project information.