Project context
This utility-scale co-located project in Romania combines 56.17 MWp of photovoltaic capacity with a 36 MW / 68.8 MWh battery energy storage system and a dedicated 110 kV grid connection. Green AdvanTech provided owner-side technical advisory during commissioning, performance validation and completion-stage review.
Technical contribution
- Technical validation across PV and BESS integration, key design constraints and hybrid operating interfaces
- Alignment support for commissioning procedures, performance-test methodology and acceptance evidence
- Review of engineering inputs, EPC reports and completion documentation for technical consistency
- Technical input to external assessment processes, keeping the focus on engineering evidence and project readiness
Why it matters
Co-located generation and storage require consistent technical logic from system design through testing and operation. Senior owner-side review helps connect field conditions, engineering documentation and acceptance evidence so that material integration issues are identified and resolved with clear priorities.